Will an Air Quality Assessment be conducted as part of the study?

/Will an Air Quality Assessment be conducted as part of the study?

Air quality effects were assessed as part of the previous (2007) Highway 417 (Ottawa Queensway) from Highway 416 to Anderson Road Preliminary Design Study and Environmental Assessment.   After careful consideration of the absence of changes in traffic conditions, as well as proximity to sensitive receptors, it was determined that an Air Quality / Greenhouse Gas assessment is not required for this bridge rehabilitation / replacement project.