Study Completion and 30-day Public Review of Transportation Environmental Study Report
he Transportation Environmental Study Report is available to download below:
GWP4170-13-00 MTO Queensway DT Bridges TESR Jul 29-24 QC.pdf
GWP4170-13-00 MTO Qwy DT Bridges TESR Vol 1 May 31-24 QC Combined.pdf
GWP4170-13-00 MTO Qwy DT Bridges TESR Vol 2 May 31-24 QC Combined.pdf
The Transportation Environmental Study Report (TESR) is available for a 30-day public review period from August 12, 2024 to September 14, 2024.
The TESR is available for public review and comment at the following locations, and on the project website at www.queenswaydowntownbridges.com
Ottawa Public Library –
Main Branch
120 Metcalfe Street
Ottawa, Ontario
(613) 580-2945
Monday to Thursday: 10:00 am to 9:00 pm
Friday: 10:00 am to 6:00 pm
Saturday: 10:00 am to 5:00 pm
Sunday: 1:00 pm to 5:00 pm
Old Town Hall
Community Centre
61 Main Street
Ottawa, Ontario
(613) 627-0062
Monday to Friday: 9:00 am to 10:00 pm
Saturday: 9:00 am to 4:30 pm
Sunday: 9:30 am to 4:00 pm
City of Ottawa
Service Centre
110 Laurier Avenue West
Ottawa, Ontario
Monday to Friday: 8:30 am to 5:00 pm
If you would like to provide comments, or require additional project information, please email the project email address queenswaydowntownbridges@bteng.ca or visit the project website at: www.queenswaydowntownbridges.com
If following consultation with MTO and BTE, you have serious unresolved concerns with the project, you have the right to make a written request to the Minister of the Environment, Conservation and Parks for a Section 16 Order under the revised Environmental Assessment Act.
A request to the Minister of the Environment, Conservation and Parks for a Section 16(3) Order for the imposing of additional conditions or a Section 16(1) Order requiring an individual environmental assessment may be made on the grounds that the requested order may prevent, mitigate, or remedy adverse impacts on constitutionally protected Aboriginal and treaty rights. Requests should include your full name and contact information.
Requests should specify what kind of order is being requested, (additional conditions or an individual environmental assessment), explain how an order may prevent, mitigate or remedy potential adverse impacts, and can include any supporting information.
A Section 16 Order request must be made during the 30-day review period. If there are no outstanding concerns after September 11, 2024, the project will be considered to have met the preliminary design Environmental Clearance requirements of the Class EA (2000) and the project can proceed to the detail design stage of rehabilitations and replacements. The request must be sent to each of the following:
Minister
Minister of the Environment,
Conservation and Parks
Ministry of Environment. Conservation, and Parks
777 Bay Street, 5th Floor
Toronto, ON M7A 2J3
minister.mecp@ontario.ca
Director, Environmental Assessment Branch
Ministry of Environment, Conservation and Parks
135 St. Clair Avenue West, 1st Floor
Toronto, ON M4V 1P5
EABDirector@ontario.ca
Obinna Obiefule, P.Eng.
Senior Project Engineer
Ministry of Transportation
1355 John Counter Boulevard
Kingston, ON K7L 5A3
obinna.obiefule@ontario.ca
If you have any accessibility requirements in order review the TESR at the locations listed above, please contact queenswaydowntownbridges@bteng.ca