This study considered the rehabilitation or replacement of bridge structures for either the short to medium term or longer term at each rigid frame bridge site. The alternatives for bridge replacement considered bridge spans that are either the same length as the existing bridge or longer. The effects of the project on cycling were considered as part of the evaluation of alternatives.