For Rapid Replacement, where will you build the new bridges?

/For Rapid Replacement, where will you build the new bridges?

The new rigid frame bridges (Metcalfe Street, Elgin Street and Main Street) will be assembled at staging sites near the existing bridges. The staging sites being considered for the rigid frames are shown below:

 

2017-12-11T20:31:23+00:00