The current EA study is focused on a bridge management plan for the 7 structures at the 4 sites under study. The long term plan for the Queensway was defined in the 2007 EA study which considered the traffic needs and deficiencies in the corridor. The 2007 EA study established the number of lanes for the freeway and the proposed freeway operation for the future planning horizon. The current EA study is one of several smaller sub-projects within the broader 2007 study area that are considering, in detail, the site specific needs that fit within the vision of the corridor long range plan.